
Nine Bus Network
Test Case Archive of Optimal Power Flow (OPF) Problems with Local Optima
Five Bus Case
- Introduction
9 bus network with 3 generators, 9 transmission lines. Four local solutions exist within default voltage bounds(±10%).
- Case File
Network Diagram
Local solution data
Diagrams of Solutions in Rectangular Form
Fig1. Local Solution 1 | Fig2. Local Solution 2 |
Fig3. Local Solution 3 | Fig4. Local Solution 4 |
Data for Local Solutions
(Back)