Adela Pagès (Universitat Politècnica de Catalunya, Barcelona)

Warm start procedures for IPM applied to the long-term power planning generation problem
ERGO Optimization day: Thursday 18 August 2005 at 13.30, JCMB 5327

Abstract

A brief description of the power planning generation model for a long term will be presented. One approach to solve this problem is through a heuristic procedure which generates a succession of similar problems. They are solved using an infeasible interior point method. Warm starting is a wise strategy to speed up to the new solution. Different warm start approaches will be presented together with its performance. Finally an extension of the problem to optimize the maintenance periods will be introduced. The use of warm starts in the branch and bound process seems a promising subject.

Seminars by year

Current 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996